NFPA 25 Compliant

Our Services & Checklists

Thorough inspection, testing, and reporting for all water-based fire sprinkler systems.

System Inspections

Inter West, LLC performs inspections in accordance with NFPA 25, applicable codes, and Authority Having Jurisdiction (AHJ) requirements. Select your system type below to see the full inspection checklist.

  • Control valves, position & supervision
  • Water supply & pressures
  • Sprinklers – condition, orientation, obstructions, temperature rating
  • Piping, fittings, supports & bracing
  • Gauges – condition, readability, pressures
  • Waterflow & alarm equipment
  • Fire department connection
  • Spare sprinklers & cabinet
  • Signs & system identification
  • Corrosion, leakage & physical damage
  • Other conditions affecting performance
  • Dry pipe valve & trim
  • Air/Nitrogen system & pressures
  • Low-air supervisory devices
  • Auxiliary drains & drum drips
  • Piping, supports & bracing
  • Sprinklers – condition & obstructions
  • Gauges – air, water & priming water
  • Waterflow alarm & supervisors
  • Fire department connection
  • Spare sprinklers & cabinet
  • Corrosion, leakage & physical damage
  • Other conditions affecting performance
  • Antifreeze solution concentration
  • Freeze point testing
  • Sampling at required locations
  • Antifreeze loop components
  • Wet system interface components
  • Piping, supports & bracing
  • Sprinklers – condition & obstructions
  • Gauges & solution reservoirs
  • Isolation, check & drain valves
  • Corrosion, leakage & physical damage
  • Signs, identification & documentation
  • Other conditions affecting performance

Periodic Testing Requirements

3

3-Year Full-Flow / Full-Trip Test

Dry Pipe & Preaction Systems — When Required

A full-flow trip test verifies the system operates as designed and identifies changes in performance over time. Required at 3-year intervals per NFPA 25 and AHJ requirements.

  • Record system air/nitrogen pressure
  • Record water supply pressure
  • Open inspector's test connection
  • Observe valve operation
  • Record trip pressure & trip time
  • Observe water delivery
  • Record water delivery time
  • Compare results to previous data
  • Inspect drains & system
  • Reset system & restore to service
  • Verify normal operating condition
5

5-Year Internal Inspection

Components — When Required

Internal inspection goes beyond the exterior to ensure critical components are clean and operating properly. Required at 5-year intervals per NFPA 25 and AHJ requirements.

  • Alarm valves
  • Check valves
  • Dry pipe valve components
  • Preaction valve components
  • Deluge valve components
  • Backflow prevention assemblies
  • Strainers, filters & orifices
  • Pressure regulating equipment
  • Corrosion, deposits, obstructions
  • Internal parts & mechanisms
  • Other applicable components

Authority Having Jurisdiction

AHJ Reporting

We handle all required reporting to your local Authority Having Jurisdiction — keeping your system compliant and your documentation current.

  • Prepare final inspection and/or testing reports
  • Upload or submit reports through AHJ portal when required
  • Include all test results, deficiencies & corrective action documentation
  • Record submission confirmations, dates & correspondence
  • Provide reports to property owner/manager
  • Maintain records in accordance with code requirements
📄
Professional Reports

Clear, complete & easy to understand

✅
Code Compliant

Performed in accordance with NFPA 25 & AHJ

🔍
Deficiency Focused

Identify issues before they become problems

🏠
Protecting What Matters

Your building, your people, your peace of mind